2nd TRACK – NEW RAILWAY TRACK BETWEEN DIVAČA AND KOPER

The infrastructural project for the construction of the 2nd track covers the construction of 27.1 km of single-track railway, which passes over three viaducts and goes through seven tunnels (https://drugitir.si/). We have been involved in the project since the beginning of the preparatory work, wherever reinforced concrete was/is used. Our single and bar FRC spacers are installed both in the Gabrovica and Vinjan viaduct. We also regularly supply spacers for the construction for the inner lining of the tunnels that are being built on the route of the 2nd track.

Specifications

YEAR

2020 - ongoing

INVESTITOR

Republic of Slovenia